Case Studies

Jacking gear pinion replacement on Seadrill’s West Elara

Delivery of 30T EOT crane to Gulf Drilling in Qatar

Crane refurbishment on oil production platform

Flare lines replacement for major Oil and Gas company in Qatar

Tank inspection using advanced NDT methods

RFID technology enhances operational efficiency

Wind turbine tower inspection using remotely-operated magnetic crawler

Life extension of fixed platform in Mexican waters

Revolutionising tank inspections with advanced technology

PSV and Instrument Calibration onboard drilling rig in Norway

Rig preparation for Saudi Aramco in the Middle East

605T load test of a BOP crane
